Contract of BOP TL (Transmission Line) for the Pedra de Amolar and Paraíso Farol wind complexes

This hiring comprising the works carried out within the scope of the implementation of wind farms include the project and complete manufacturing of equipment with all accessories necessary for its perfect installation and operation, testing, packaging, transportation and storage, assembly and its supervision on site, final field tests and commissioning of the 230 kV transmission line that will interconnect Pedra de Amolar Collecting Substation 34.5/230 kV to the Connection Bay located at the João Câmara II Substation (CHESF).